Waterfall model
The waterfall model is a project-management approach in which work moves through sequential phases, such as requirements, design, development, testing and maintenance. Each phase is largely completed before the next begins, so changes become harder to accommodate as work progresses.
It is most associated with software development. In finance, a "waterfall model" means something different: a calculation showing how cash is distributed among lenders or investors in a specified priority order.
How it works
A team agrees on requirements, documents the design, builds the product and then tests it against those requirements. Phase approvals control progress. Returning to an earlier phase is possible, but it requires revising work already approved or completed.
Waterfall fits projects with stable requirements and clear acceptance criteria. It is a weaker fit when the team still needs to discover what customers want. For an early-stage startup, the risk is spending the build budget before users test the core assumptions.
A $60,000 project becomes $70,000 after a late change
A hypothetical software project has a $60,000 budget, including initial maintenance. A common five-stage grouping looks like this:
| Stage | Main output | Planned cost |
|---|---|---|
| Requirements | Agreed scope and acceptance criteria | $5,000 |
| Design | Architecture and interface specifications | $10,000 |
| Implementation | Working code | $30,000 |
| Testing | Verified functionality and fixes | $10,000 |
| Maintenance | Initial post-release support | $5,000 |
| Total | $60,000 |
During testing, users reveal that a required approval step is missing. Revising the design, code and tests costs another $10,000.
The revised total is $60,000 + $10,000 = $70,000. The problem is not that Waterfall forbids changes. It is that late discoveries can require several phases of rework. Stage names and groupings vary; there is no universal five-stage list.
Questions people ask
What is the Waterfall model vs. Agile?
Waterfall organizes work into sequential phases against an agreed plan. Agile emphasizes short feedback cycles and adapting plans as teams learn. Agile does not mean working without requirements or documentation.
Are Waterfall and SDLC the same?
No. SDLC means software development life cycle: the overall process of creating and maintaining software. Waterfall is one way to organize that process.